From Fire and Rescue it was delivered to Lai Pa:
A few minutes ago, the fire fighters from the Haifa station and the shift commander, Rabbi Reshef Eitan Ripa, arrived at Herzl Street in the city. A balcony of a residential building began to collapse while rocks were falling from a height, when by chance not a single passerby was injured.
The fire fighters are currently fencing the area of the collapse to prevent the passage of citizens and are waiting for the municipal authorities to accept responsibility and continue treatment through the director of engineering.
The doll in the city engineer's office that is supposed to handle dangerous buildings. Maybe you will finally send to the Technion to get a degree in structural engineering? It's time to take your finger off the xx.
Not new in Haifa, years ago a balcony fell and with it a relative of mine and his girlfriend. I wonder where he is today..
One of the most beautiful houses in Haifa in front of "Beit HaKaron" Shmarihu Levin (former mayor) corner of Herzl
No wonder.. old construction without the state inspecting or transferring budgets to the periphery for a rehabilitation and maintenance plan. We are not the state of Tel Aviv so why would anyone invest here? It's only a matter of time until luck runs out and disasters start happening here. Even 20 years ago I lived in a new multi-story building and the beams that covered the building broke off and fell down. If a heavy tile fell from the 16th floor and no one Do nothing, what a wonder something will change. Trees are falling apart, and pigs are wandering. This is Haifa
it's special
Haifa is falling apart
Doctor of Architecture managed the city and still these are the results.
And the one who neglected her for years is about to return to power.
All that remains is to wish and hope for good news for the residents of Haifa.
Why is there no address?
There is a golden opportunity for a young and energetic mayor in Haifa
Etzioni, instead of Hatyar Yahav.
Take the initiative and choose Zionist.
Good for the city and its residents, very important.
Yona introduced 200 participating families to Hadar
Closed 3 state schools around Hadar
He closed kindergartens and thus deported a strong immigrant population
Many of those who stayed were those who could not leave
Crime apartments and foreign workers were bought near a normative population
Many don't care about the building or compiler at all. They are temporarily there
Many investors came to make a quick profit, they heard that there is a reality in Hadar
They also don't really care about maintenance and investment in the building
This is how Hadar crumbles and has no representation in the council at all
Out of 31 members maybe 1-2 live in the Hadar area.
Kiryat Haim has 7 members when it is only 10 percent and smaller than Hadar in the population.
This is the situation, this is the mayor who is going to return to another five years of paralysis and destruction.
And we are like blind people choosing Bihav again who for years has done nothing for the city, continue to support him and rocks will fall on us not just stones
A dysfunctional municipality, where is the supervision of dangerous buildings
Tama For the whole city of Haifa
How surprising.
About two years ago I was walking on Herzl Street and right there a brick fell in front of me, and suddenly it fell on my head.
I immediately notified the municipality and an inspector even came that day. I wish I had written down his name to say that he hasn't done anything since then.
So yes, it's not surprising that it happened. Very disappointing that the municipality did nothing about it when I complained about it.
After Herzl turned over in his grave following the disintegration of the Jewish state on the eve of Simchat Torah (serious events until 06.10.2023 for their number), and later turned over in his grave during the events of Simchat Torah themselves, and after he turned over in his grave in the presence of a media campaign that indicates that for a vocal (and sick) part of the public the token did not fall - Herzl begins to rain stones of disintegration on us and everything is done by the hands of heaven.
Old house, poor maintenance. The owners are responsible.
Next to the funds building...buildings built in the 30s...
No balcony collapsed.
These are tubza stones used to cover the wall, which detached from the wall and fell on the sidewalk.
No danger to the stability of the building is observed.
The danger is visible to passers-by near the building.
Maintenance / construction / use of stretching materials for every beam... only hanging unruly contractors / workers will stop the abundance of these disasters!
Does the engineering department still exist?
Herzl Street is falling apart since Hadar was a city of refuge
Tama to the whole city of Haifa, it is the municipality's responsibility if something happens, you are waiting to be put on trial and lawsuits
Do you know what is done abroad about such a dangerous case?
An expert inspector of the municipal engineering department came. If there is a danger, immediately declare a dangerous building.
Gives an evacuation order to all residents of the building. and immediately submits a repair order to the property owners. If they don't act immediately
and present to him a plan in a reasonable period of time for the complete repair of any such hazard, for example all the balconies in this building,
He announces a permanent evacuation of the building and files a lawsuit against them from the municipality for damage to the environment.
Do you know what we are doing here? is nothing. Fence off the area where a retaining wall or balconies collapsed
that pedestrians will not be able to sue the municipality and say that it is not a problem of the municipality.
This is how a doll is employed to handle dangerous buildings.
Missing constructors?