(haipo) - After more than a year since the start of operation of the cable car connecting the large transportation center "Merzalit Hamfaretz" with the Technion and the University of Haifa. The bridge at the university station, which was blocked throughout the period, was opened.
As a reminder, in April 2022, the cable car connecting the large transportation center "The Bay Center" with the Technion and the University of Haifa began operating. A bridge was built at the University of Haifa station to serve as a crossing for the cable car. A bridge that was blocked to cable car users, this was due to the lack of permits from the Haifa Municipality to the Ministry of Transportation to open it. On the cable car island, they had to use the bridge designated for students studying at the university throughout the period.
An extensive article on the subject was even published in Hai Pa, but many complaints continued to be received both by the Hai Pa system and the Haifa municipality.
Today, as mentioned, we are happy to announce that the bridge has been opened and can be used.


The university needs a direct bus connection on its ring road to the Technion and via the Dania - Tirat HaCarmel road connection for buses only, in order to shorten the journey to the train and Hoof HaCarmel station from 20-30 minutes to 15. This is what is urgently needed to be created and not culverts for those who come by car the private
The main thing was that the antipathetic guards were replaced?
good time
If and when they plan and connect escalators to the cable car station on Dori road, which is currently disconnected, then there will be a connection to the Neve Shaanan neighborhood and this is possible.
It is incorrect to write that the cable car connects the Neve Shanan neighborhood to the heart of the bay. There is no connection between the two