(lives here in the parking lot) - Tenants from 14 Moriah Street claim that even though their residential building was completed 4 years ago and they have been living there since then, it is still not possible to use all the parking spaces. According to them, the building has mechanical parking lots, but they cannot be used due to the overcrowding in the place.
It is not possible that I bought an apartment with two parking spaces, and I hardly ever use one of the parking spaces
"I was really debating whether I wanted to move into the building," says one of the tenants, "and in retrospect, I am very satisfied with the location of the building and the apartment itself, but every time I park the car, I feel sad. We bought an apartment with two parking spaces, one on top of the other (mechanical parking lots). In practice, what happens is that there is not enough space to lift the car, which is in the upper parking lot, and enter the lower parking lot. This means that even though my apartment has two parking lots, I can only use one, and those who arrive second, have to look for parking on the street If that's not enough, the parking space that I do have is very narrow, and after I park the car I have a difficult struggle to get out of the vehicle.
4 years after they moved in here, there are still negotiations with the construction company, which built the building next to ours, and according to us took over a meter from our building. The result is that it is impossible to use the parking lots comfortably. I repeatedly contact the municipality, because it is not clear to me how the building even received Form 4 in such a situation and more than that, isn't the municipality a regulator and a contractor can do anything in this city that comes to his mind? Needless to say, I am not getting any answers from the municipality."

According to the tenants, 4 years ago Form 4 was received for the building, but even then, when Form 4 was given, not all things in the building were completed properly. Form 4 was given to the building and it was possible to enter and live, but the municipality demanded that repairs be made and conditioned the issuance of the form on depositing a bond. In practice, 4 years have passed and things have not been corrected.

Another claim of the tenants is that the way the tenants in the adjacent building, Moriah 16, are camping. According to them, they cannot safely exit their parking spaces because of the parking of the tenants in the building next door. They don't blame them, of course, because they also park where the person who built the building instructed them to.
comments
The response of Eshat Sorin Yazum and Construction Ltd.: The improper conduct has nothing to do with us
Eshat Sorin Yazum and Construction Ltd. claims that the reason why the tenants find themselves without parking is that tenants from the adjacent building are parking in a space intended for parking for Moriah 14, and it has nothing to do with them.
"Eshat Sorin Yazum and Construction Ltd. initiated and carried out two TMA 38 strengthening projects at 14 and 14A Moriah St.. In the adjacent lot, at 16 Moriah St., Shetit Company initiated a separate TAMA 38 project (demolition) .
As part of the construction permits for the three aforementioned projects, it was determined that a common access road would be built for the two plots, which would actually be combined into one condominium (which would include 3 buildings - Moriah 14, 14a and 16).
Tenants in the Moriah 16 project park vehicles in the area approved in the building permit, as part of the common access road (including a fire fighting plaza!). Of course, in this area it is forbidden to park in any way.
It is also clear that the aforementioned improper conduct is not related to Isset Sorin Construction and Construction Ltd. and of course is not its responsibility.
Despite the above, before the line of the law and beyond its duty, the company did not leave the apartment owners alone to remove the hazard in front of their neighbors, etc. Shetit, but rather assists in the conduct to find a solution to the situation and in a way that will prevent the parking of vehicles from the Moriah 16 building in the wrong way as was done."
The municipality: The parking lots were built according to the building permit
The municipality stated in response that the parking lots were built according to the building permit issued for them.
Friends, your double parking business is of no interest to the general public, take it in.
Maybe enough with you?
I read the article and the answers and see through.
1. The root of the problem is Esat Sorin Ltd., a company that cannot be trusted
at her word. She knew about the construction anomalies in 2018.
She did not report to the residents of Moriah 14 until 2022.
2. Provided mechanical parking lots made in China from the importer's company that went bankrupt
Together with two additional service companies and recently a company
Parktech Ltd. is ready to provide a basic service of the facility's demolition
only
3. Until today, the parking lots have not been delivered in accordance with the sales law for 4 years!!
4. Conclusion, beware of Eshat Sorin Ltd.
Personally, I would not enter into a deal with her" even if she changed her name.
Manager Simona Sorin, failed and is only looking for who is to blame for the failure
her own personal Both in planning, also in execution and most importantly in association
territories for herself in order to sell them and generate additional income for herself
Due to the disruption of the tenants' parking lots.
5. You are invited to see how she finished the project of Moriah 14 and 14a.
Tenants without parking spaces in light of the collapse of the facilities and service company
Not willing to take responsibility, certainly not the developer.
6. "Let them go to trial" which will take 4 or 6 years. This is the answer of Simona Sorin, a shareholder in the company and a manager.
Tenants are being misled after they invested millions of shekels in the project.
How many lies can Hab Eshet Surin write?
We will prepare for today 10.12.22 There are no parking spaces for the two buildings at Mogia 14,
Not because of the residents of Moriah 16 (which is also a problem of a developer 14 who did not feel an invasion from 2018).
There are no parking lots because "the developer saved a lot of money" and therefore the parking lots did not pass an inspection test. A facility that is delayed in an inspector's inspection cannot insure the parking facility!! Thus there are 18 parking lots that are broken and without insurance.
Any other engraving is typical of this company and especially of the manager Simona Sorin. The manager of the parking lot operation who is still trying to get them to leave said it and it was recorded. "How did you get form 4"
Moriah 14 Haifa
Today I noticed the rating of the company in its ETA, reviews: 3.7
A completely misleading score.
Out of 6 recommend a score of 5 these are the facts of the company
And one with working relationships and partnership in the distant past with Eshet Sorin Ltd.
Without the opinion team of the company's employees, Marina, Karolina and Or
which was written in Zion 5. The respondents score would drop to 1.
Another month has passed. They are still working on parking lots as if they are "normal" according to Simona Sorin. 4 years ago when she came up with a report for the municipality
A smooth checker with no comments on parkings that apparently didn't work, which
Disqualified by the first inspector, they were approved as mentioned and a year later they did not work
Disqualified by 2 other testers due to faults noted by the first.
For some reason it seems to me that the Parktech company and the facilities inspector pulled their hand out of desperation to bring the parking lots
which Eshat Sorin provided for normal operation.
Update from two hours ago.
For the fourth time, a facility inspector and a lifting tool did not approve
the parking lots at Miria 14 and 14 a
Eshet Sorin's regretful answer that he probably wrote down
A young lawyer who, regardless of connection, noted the reason "drinking"
I find it hard to believe the response of the building department of the Haifa municipality
written in good faith. It seems to me that an inspection by the municipal inspector, an external inspector, who and how they gave approval for Form 4, such as the relationship with
The entrepreneur who built Moriah 14 a
There is no logic and no truth in the municipality's answer.
Esat Sorin's answer has nothing to do with the issue of parking, but a story
How much effort she makes to face the law.
Simona, you found out about the anomalies in 2018, you didn't do anything, you knew about us about 8 months ago when you gave us the plan
for inspection and signature.
It seems correct that in the first step you mainly check the program
that you threw with her from you to the employee you drank.
Step two is the stamp that it matches the construction plans
And only after that will the tenants (who until then did not know that the adjacent building "drank" them 1.60 meters) sign.
I don't understand the silence of Ozer Esat's missing partner.
Read his skills as an expert!! How didn't he feel in theft of space
Why is he not involved in construction?
efforts
Moriah 14 and Moriah 14a
And the contractors continue to cry and grumble... before they give what they promised to the tenants. By the way, what happens in the TMA programs, each contractor does what suits him and there is no comprehensive view and determined enforcement on the part of the construction supervision when the rights of the tenants or neighbors are blatantly violated!
You said "you drank", you said everything... there are more examples
Remind me what they called the contractor whose walls supporting Ramot Ramez fell? And that criminal charges were filed against him for building without a permit in the Carmel Castle? Isn't this the same one who donated money to Yona Yahav?
in the body of the article
When you want to hire tenants and make extra money,
This is what happens, "two entrepreneur parking lots" are created that were sold for about 100 thousand NIS.
In Moriah 14 "luxury building" the parking lots have been working for 4 years.
The engravings of the municipality and the developer, contractor, architect are completely irrelevant.
I don't understand how they approve construction permits for Esat Sorin before correcting the default approved by the municipality out of an apparent mistake or misappropriation
Contractor relations - the construction department!!
Who is the attorney who wrote the response to Eshat Sorin?
It may be the same one who charged each tenant 5700 shekels
for the registration of the buildings. Not a small amount when it comes to 18 tenants.
If it is indeed the same one, it's a shame for the attorney that he didn't know about the invasion of Shit into territory not his, it's more likely that Simona didn't inform him.
But that's not the point.
The subject is faulty parking lots for 4 years, 4 companies that provided cheap facilities "saved you a lot of money" or "how did you get Form 4" these are things that senior officials in the maintenance company said
which was taken about 8 months ago and they still haven't been able to get approval
Normality for hanamat that were disqualified 3 times with instructions for correction.
As usual, Simona is like Simona, no one understands!!
Only the genius Simona, that's how tenants were left without parking!!
Currently delaying other serious construction failures.
Answer to private 69
Do you have any idea what the cost of a claim is?
Attorney, mechanical engineer, lifting tool engineer, certified surveyor and admissibility opinion.
At the end of a 3-year trial, this is Eshat Sorin's battle cry. "In the best case it will end in 4 years with dozens of discussions" Check the trial worm!!
Response to letter 96.
A lawsuit takes a minimum of 3 years.
Attorney expenses, certified engineers, mechanical engineers
Certified surveyor, you reach 100 NIS + wait 3 years and if you win, you will receive a court order, etc., about 25%
If I manage to prevent others from falling out of business with this company, we have succeeded!!
Yes, we refrained from filing a lawsuit because there were between us and I was punishing for a sin
That what Simona promises, she will fulfill.
All in all, I am the main culprit for not filing a lawsuit against the failed company managed by Simona Sorin.
Tsatsedek, which is a lot of blah blah, because apparently Attorney Khirtat
Things that are not relevant to the article and not to the claim of the parking garages.
The person who recorded Eshat Sorin's response is, at best, a young intern. Instead of referring to 4-year faulty parkings, he's scratching his head
On Moriah 16.
A client like Eshet Sorin guarantees lifetime income
to the office that takes care of her
How much blah blah. Go to court
Eshat Sorin did not provide proper parking multipliers without anything to do with the parking lots and/or other claims.
In Moria you don't have to own cars at all, you have to demand buildings without any private parking, or a minimum standard, certainly not two parking spaces per apartment. in no way. As Tel Aviv does in the city center - in the city center only public transportation.
And she didn't write about a private car.
by the way "quite"
Enough for people like you who live in a movie about themselves and think that if they write "enough" about something that doesn't concern them personally it will interest someone.
Please change to a Fiat 500, there will be room for everyone
You didn't realize that the parking lots are broken and haven't been working for 4 years!!
Regarding the size of the cars, this is not the main problem, so we do two or three maneuvers.
A. Genius type G
B. An act I suspect of saying what I think
on divisor relations. Building contractors, there can be no approval
Traffic department for parking adjacent to a wall 3 cm.
Disaster Controls and Foreign Affairs There are no quick rescue options
Please note that the company under the management of Eshat Sorin, as an architect and more, does not answer the main claim.
1. Form 4 was given at the beginning of 12.18 about 9 months late.
2. Since then, the mechanical parking lots have received an inspection permit
Professional but on the contrary saved you a lot of money.
It is not clear who approved the issuance of Form 4 with faulty parking.
3. After the garbage companies went bankrupt, Simona brought a company
Parktech Ltd. is serious and has been working for more than 6 months
Bring the parking lots into action!
But Simona blames her whole answer on her teachers 16 instead of concentrating on the reason why the parking lots have been broken for 4 years and they haven't worked a day
one. These are 9 lower parking spaces in mechanical parking facilities.
This sign is used to having conversations in a way that puts anyone to shame
And as evidence, she has already been removed from court hearings twice for disrupting the hearing, when recently she was fined in addition to being removed from the courtroom as well
for 1500 NIS.
I refrain from calling her derogatory names here and update her personally about my opinion of her and her company.
The municipality's response is superficial and tends to cover up an omission that earned Eshat Sorin the "two parking spaces for an entrepreneur"!!!
Please note that the company under the management of Eshat Sorin, as an architect and more, does not answer the main claim.
1. Form 4 was given at the beginning of 12.18 about 9 months late.
2. Since then, the mechanical parking lots have received an inspection permit
Professional but on the contrary saved you a lot of money.
It is not clear who approved the issuance of Form 4 with errors.
3. After the garbage companies went bankrupt, Simona brought a company
Parktech Ltd. is serious and has been working for more than 6 months
Bring the parking lots into action!
But Simona blames her whole answer on her teachers 16 instead of concentrating on the reason why the parking lots have been broken for 4 years and they haven't worked a day
one. These are 9 lower parking spaces in mechanical parking facilities.
This sign is used to having conversations in a way that puts anyone to shame
And as evidence, she has already been removed from court hearings twice for disrupting the hearing, when recently she was fined in addition to being removed from the courtroom as well
for 1500 NIS.
I refrain from calling her derogatory names here and update her personally about my opinion of her and her company.
The municipality's response is superficial and tends to cover up an omission that earned Eshat Sorin the "two parking spaces for an entrepreneur"!!!
Please note that the company under the management of Eshat Sorin, as a carpenter and more, does not answer the main claim.
1. Form 4 was given at the beginning of 12.18 about 9 months late.
2. Since then, the mechanical parking lots have received an inspection permit
Professional but on the contrary saved you a lot of money.
It is not clear who approved the issuance of Form 4 with errors.
3. After the garbage companies went bankrupt, Simona brought a company
Parktech Ltd. is serious and has been working for more than 6 months
Bring the parking lots into action!
But Simona takes all her frustration out on her 16-year-old teachers instead of concentrating on the reason why the parking lots have been broken for 4 years and they haven't worked a day
one. These are 9 lower parking spaces in mechanical parking facilities.
This sign is used to having conversations in a way that puts anyone to shame
And as evidence, she has already been removed from court hearings twice for interfering with the hearing, as recently she was fined in addition to the fact that she was also removed from the courtroom
for 1500 NIS.
I refrain from calling her derogatory names here and update her personally about my opinion of her and her company.
The municipality's response is superficial and tends to cover up an omission that earned Eshat Sorin the "two parking spaces for an entrepreneur"!!!
The residents are indeed right. good week
I studied a bit of architecture as an engineer, so I'm not pretending, but this pair of buildings is both tasteless and poorly executed. They paid millions for an apartment and got Eckerstein simply with a parking lot that costs NIS 50 per meter for the contractor, crowded and unusable parking lots and an unclear design. The only good thing there is the location. The price of rioting by the TMAs and the interested parties from every direction...
You're such a jerk. Yes, there are indeed falls, but with such a company I have not yet fallen. Because of the shame of how I fell I am ashamed to send
Dead of the rusty solar boiler system after two and a half years.
Pipes that were collected from scrap warehouses, but the one to blame is the subcontractor Solarit who gave it to another subcontractor. All due to the fact that the supervision was at the seventh level.
The parking lot was installed and dismantled 3 times beyond belief. Tenants spend private money on repairs. Because they are tired of Sorin's act in Simona's management.
You are wrong about the design. The zigzag on the front of the Moriah 16 building was designed by the famous architect Ariel Wetterman.
The occupancy permit was given years after Yona was not mayor.
And who was the mayor at the time the building permit was given with this impossible parking? What's more, the building stands on an area that should have been green space.
I am convinced that the donations given by the manager of the contractor "Shatit" to Haifa Mayor Yona Yahav have nothing to do with the construction approvals received by that contractor.
Drinking is a supporting actor.
Esat Sorin became aware of the issue back in 2018. She only knew us tenants six months ago. Why didn't Sorin's wife stop her son?
When she saw this and more by a drink meter. Because what does she care??
Once again, I am returning to a secondary drinking problem. Shacha parking lots have been working for 4 years. This is acceptable to the Simona.
She drafted her answer, probably with the help of a lawyer, without referring to the main thing, which is parking lots that don't work.
The inspectors of the lifting facilities asked her for a manufacturer's certificate, on Friday 18.11.22/XNUMX/XNUMX I learned that they did not receive it!!!
The testers asked for previous reports and they were told that there were none!!
I happen to keep documents and the one who forwarded previous reports to the last inspector is me, Yair Karso.
The above is a huge box of lies!!
I don't know and pray for the quality of the materials such as water pipes or electricity under the tiles of the apartment.
About a year and a half ago, the electricity to the building was cut off. Upon inspection, it turned out that it was
Water infiltration under the lobby flooring which caused the electric wires to rot
Again, we paid for the repair with our own money, similar to the explosion of rotten pipes of the solar boiler system, and this after two and a half years.
It's Dre on Saturdays that forced us to bring a private service.
All this because this sign does not answer the phones.
How much blah blah. Go to court
?